Trust
Average evidence score
Across 251 contract records. Scores reward independent outlets, primary documents and complete details.
By grade
Last source check
4 Oct 2026
The checker removed or corrected 65 details it could not find in the sources.
How much of each record is actually on the public record.
The core question. The rest have no contractor in any source we found.
Award dates are often missing or only a year.
One newspaper, however good, is one point of failure.
Shown as “Bidding closed” across the site until the result is sourced.
798 source links, 83 outlets.
Anyone can challenge a fact, but only with a link to evidence. Moderators decide; the community backs or doubts.
No challenges yet. Open any road and tap “Challenge” on an entry you can correct.
It measures how well a fact is evidenced. It says nothing about whether the road was built well.
The fastest way to raise the score of a road is a primary document: a work order, a tender result on (n)Procure, a standing-committee resolution or an RTI reply. Open the road, tap “Challenge” or “Add a missing work”, and paste the link.
The thinnest records. A single document could fix each one.