Rachana Construction

9 works across 8 assets · ₹912 crore in sourced contract value

Flyover

Vadaj junction flyover

Original construction · AMC

Completed
Awarded
Not on record
Completed
Sep 2026
Value
₹128 crore
Age
under 2 months

Approved in February 2023 at about Rs 107 crore together with a two-lane underpass; final cost reported as Rs 127.92 crore. Opened roughly six months late, which an official partly attributed to contractor-related issues. The companion Dadhichi Bridge–Akhbarnagar underpass was put on hold.

Flyover

Sindhu Bhavan junction flyover, SP Ring Road

Original construction (ADB Package 6: Shilaj and Sindhu Bhavan) · AUDA

Under construction
Awarded
12 Mar 2024
Completed
Not on record
Value
₹118 crore
Age
—

Rs 118.29 crore share of the Rs 237.99 crore two-flyover contract with a 24-month period. In 2021 AUDA had estimated the two bridges at Rs 79 crore together, and a May 2023 report at Rs 188 crore.

Flyover

Shilaj junction flyover, SP Ring Road

Original construction (ADB Package 6: Shilaj and Sindhu Bhavan) · AUDA

Under construction
Awarded
12 Mar 2024
Completed
Not on record
Value
₹120 crore
Age
—

Rs 119.70 crore share of a Rs 237.99 crore two-flyover contract (about USD 28.4 million on ADB's list, dated 31 July 2024), 24-month period. Foundation stone laid virtually by Amit Shah on 15 March 2024; service-road concreting began in July 2024. Package progress was about 11.5% at end-2024.

Rail overbridge

Ranasan junction railway overbridge, SP Ring Road

Original construction · AUDA

Completed
Awarded
Mar 2018
Completed
25 Dec 2023
Value
₹60.79 crore
Age
2 yr 9 mo

Ahmedabad Mirror and the Times of India report a Rs 53.79 crore contract given in March/April 2018 with a 24-month period; the cost stated at the December 2023 inauguration was Rs 60.79 crore. The Times of India described progress in 2022 as very slow.

Rail overbridge

Sanathal junction railway overbridge-cum-flyover, SP Ring Road

Pothole repair and resurfacing · AUDA

Status not confirmed
Awarded
Not on record
Completed
Not on record
Value
Not disclosed
Age
—

Per DeshGujarat (16 December 2023), the flyover developed potholes in the June 2023 rains; AUDA issued a notice to the contractor, Rachana Construction Co, and the project management consultant, Casad Consultants, under the three-year defect-liability period, and experts from SVNIT Surat began an inquiry. AUDA announced a six-day closure from 16 to 21 December 2023 for pothole repair and resurfacing, with the contractor to bear the cost. No source opened reports the outcome of the inquiry or confirms that the resurfacing finished on schedule.

Checked against sources
Rail overbridge

Sanathal junction railway overbridge-cum-flyover, SP Ring Road

Original construction · AUDA

Completed
Awarded
Mar 2018
Completed
10 Mar 2023
Value
₹96 crore
Age
3 yr 7 mo

Cost is given as Rs 96 crore by DeshGujarat, 'about Rs 100 crore' at the inauguration and Rs 92 crore by the project consultant and a 2021 TV9 list. Ahmedabad Mirror says the work was allotted in March 2018 with a 24-month period; the Times of India says it should have finished by April 2020. Casad Consultants was project management consultant.

Flyover

Naroda Patiya – Galaxy flyover

Original construction · AMC

Under construction
Awarded
2023
Completed
Not on record
Value
₹235 crore
Age
—

The AMC standing committee approved the flyover in February 2023; the DeshGujarat report of that meeting gives both Rs 235 crore and Rs 165 crore and a 30-month period. Later reports give the cost as Rs 197.98 crore (DeshGujarat, Nov 2025), Rs 206.60 crore (Gujarat Samachar, Dec 2025) and Rs 276 crore (DeshGujarat, Aug 2026). Work began on 17 July 2023 per DeshGujarat (March 2025; an August 2026 report says 16 July 2023) with a 36-month period; progress was put at about 40% in March 2025. Reports attribute the delay to forest-department land in the alignment and utility shifting. In August 2026 DeshGujarat and GSTV reported that the AMC standing committee fined the contractor, named as Rachana Construction, Rs 50 lakh for slow progress and extended the deadline to July 2027 (ThePrint says June 2027).

Flyover

Dehgam (Naroda-Dehgam) junction flyover, SP Ring Road

Original construction · AUDA

Under construction
Awarded
Jan 2019
Completed
Not on record
Value
₹60.33 crore
Age
—

Work order issued January 2019 for Rs 60.33 crore with a December 2020/January 2021 deadline. The Times of India reported in December 2022 that construction stopped midway because of unshifted GETCO lines and attributed the lapse to AUDA's consultants and supervising engineers. A CEPT student report names Multi Media Consultants as PMC. Completion date not found; treat status as unverified after 2022.

Flyover

Shantipura junction flyover, SP Ring Road

Original construction · AUDA

Completed
Awarded
Not on record
Completed
Not on record
Value
₹93.76 crore
Age
—

Ahmedabad Mirror lists a Rs 93.76 crore contract starting January 2019 with a June 2021 deadline; in November 2021 an AUDA official expected completion by March 2022, citing the railway portion. The consultant's site gives a project cost of Rs 81.90 crore. Exact opening date not found; the bridge was in use by 2026.