HighwayCompleted

Bagodara-Tarapur-Vasad highway (SH-8) six-laning

GSRDC / R&B Gujarat · Bagodara - Vataman - Tarapur - Vasad · 101.9 km

The 101 km state highway that links the Ahmedabad-Rajkot road at Bagodara with NH-48 at Vasad, the shortest route between Saurashtra and south Gujarat. After a 2011 BOT concession failed, it was six-laned in two annuity packages completed in 2021 and 2022.

3
works on record
4 yr 8 mo
since last completed (19 Feb 2022)
₹1,654 cr
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 3 of 3

    Package I: Bagodara-Tarapur (53.8 km) on modified annuity

    Completed
    Contract awarded
    Not on record
    Work started
    Not on record
    Completed
    19 Feb 2022
    Contract value
    ₹649 crore
    Age since completion
    4 yr 8 mo

    CARE Ratings records a 16.5-year concession with GSRDC, project cost Rs 649.21 crore (Rs 196.10 crore construction grant), provisional COD on 19 February 2022 and final completion in mid-2022 (the rationale gives both 9 June and 2 July 2022). Formally dedicated on 22 April 2022.

  2. Work 2 of 3

    Package II: Tarapur-Vasad (48 km) on DBFOMT annuity

    Completed
    Contract awarded
    Not on record
    Work started
    Not on record
    Completed
    7 Oct 2021
    Contract value
    ₹1,005 crore
    Age since completion
    5 years

    Scheduled for dedication by the Chief Minister on 7 October 2021 (a later report says it was completed in October 2021); includes 18 flyovers, 24 underpasses, 38 km of service road and a toll plaza at Bochasan. The R&B minister said in July 2021 that the firm doing the six-laning would maintain the stretch for 15 years. The Rs 1,005 crore figure is as stated in the DeshGujarat report, which quotes the company.

    Checked against sources
  3. Work 1 of 3

    Six-laning on BOT (toll) - abandoned

    Cancelled
    Bidder (not the builder)
    GVK Development Project Ltd
    Contract awarded
    21 Feb 2011
    Work started
    Not on record
    Completion
    Not on record
    Contract value
    Not disclosed

    GSRDC signed the concession for the 101.9 km road on 21 February 2011, with work due October 2011 to April 2014 and a projected Rs 4,968 crore premium to the state over 27 years. In July 2021 the R&B minister said GVK had left the works incomplete, after which the road was re-bid as two packages.

    Checked against sources

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Bagodara-Tarapur-Vasad highway (SH-8) six-laning.

Snap a photo next time you drive past and be the first to post.