RKC Infrabuilt

2 works across 2 assets · ₹1,005 crore in sourced contract value

Highway

Bagodara-Tarapur-Vasad highway (SH-8) six-laning

Package II: Tarapur-Vasad (48 km) on DBFOMT annuity · GSRDC / R&B Gujarat

Completed
Awarded
Not on record
Completed
7 Oct 2021
Value
₹1,005 crore
Age
5 years

Scheduled for dedication by the Chief Minister on 7 October 2021 (a later report says it was completed in October 2021); includes 18 flyovers, 24 underpasses, 38 km of service road and a toll plaza at Bochasan. The R&B minister said in July 2021 that the firm doing the six-laning would maintain the stretch for 15 years. The Rs 1,005 crore figure is as stated in the DeshGujarat report, which quotes the company.

Checked against sources
Road

Kharicut Canal redevelopment corridor (road over covered canal)

Phase 1, Package 1: Naroda crematorium – Navyug School crossing (Ch. 0–2500) · AMC (50:50 funding with Gujarat irrigation department)

Under construction
Awarded
Not on record
Completed
Not on record
Value
Not disclosed
Age
—

Contractor as listed by Gujarat Samachar on 25 June 2024 (single source); its table names 'RKC Infrabuilt' for this package while the article text calls the contractor of packages 1 and 4 'RKC Infrastructure Ltd'. The table prints the package amount as Rs 2,500 crore, which cannot be right because the same article puts all five packages at Rs 1,250 crore in total (it is probably a misprint for about Rs 250 crore), so no package cost is shown here. The same report carried AMC opposition leader Shehzad Khan Pathan's allegation of Rs 240 crore of corruption through deviations from the tender design, including a claim that the contractor of packages 1 and 4 built a diaphragm wall instead of the specified RCC boxes and was paid Rs 99 crore; the standing committee chairman said there was no corruption and an additional city engineer said work was proceeding as per the tender. These are allegations, not findings.