Ahmedabad–Dholera Expressway (NE-7 / NH-751)
NHAI · Sarkhej – Sindhrej – Vejalka – Dholera SIR – Adhelai · 109 km
A greenfield access-controlled expressway from Sarkhej on the SP Ring Road to the Dholera Special Investment Region, built in four EPC packages.
Build history
Every construction, widening and repair we could source, newest first.
- CompletedWork 4 of 4
Package 4: Dholera SIR–Adhelai (38 km)
- Contract awarded
- 2020
- Work started
- Dec 2021
- Completed
- Mar 2026
- Contract value
- Not disclosed
- Age since completion
- 7 months
The January 2023 NHAI status list names the Dineshchandra R Agrawal Infracon – MKC Infrastructure joint venture (appointed 13 December 2021, 28.19% progress); Wikipedia and a May 2024 NHAI under-implementation list (as uploaded to SlideShare) name only Dineshchandra R. Agrawal Infracon Pvt Ltd. For the whole expressway, Wikipedia gives a cost of Rs 3,196 crore excluding land and the 2023 status list a total capital cost of Rs 4,110 crore; no package-level cost was found.
Checked against sources - CompletedWork 3 of 4
Package 3: Vejalka–Dholera SIR (22.5 km)
- Contractor
- GHV (India) Pvt Ltd
- Contract awarded
- 2020
- Work started
- Jul 2021
- Completed
- Mar 2026
- Contract value
- Not disclosed
- Age since completion
- 7 months
Appointed date 19 July 2021 per the January 2023 NHAI status list (the May 2024 NHAI list uploaded to SlideShare shows 20 July 2021); 22.5% progress in January 2023. Wikipedia gives the award as August 2020 and the expressway's inauguration as 31 March 2026.
Checked against sources - CompletedWork 2 of 4
Package 2: Sindhrej–Vejalka (26.5 km)
- Contractor
- Sadbhav Engineering Ltd
- Contract awarded
- 2020
- Work started
- Jan 2022
- Completed
- Mar 2026
- Contract value
- Not disclosed
- Age since completion
- 7 months
Appointed date 21 January 2022; 11.7% progress in January 2023. An NHAI under-implementation list dated May 2024 (as uploaded to SlideShare) shows the contractor for this package as Sadbhav Engineering Ltd together with Montecarlo Construction Ltd.
Checked against sources - CompletedWork 1 of 4
Package 1: Sarkhej–Sindhrej (22 km)
- Contractor
- Sadbhav Engineering Ltd
- Contract awarded
- 2020
- Work started
- Jan 2022
- Completed
- Mar 2026
- Contract value
- Not disclosed
- Age since completion
- 7 months
Appointed date 11 January 2022; 21.4% progress in January 2023. An NHAI under-implementation list dated May 2024 (as uploaded to SlideShare) shows the contractor for this package as Sadbhav Engineering Ltd together with Montecarlo Construction Ltd.
Checked against sources
Citizen reports
Anonymous photos and notes from people who use this stretch.
No reports yet for Ahmedabad–Dholera Expressway (NE-7 / NH-751).
Snap a photo next time you drive past and be the first to post.