Dineshchandra R Agrawal Infracon Pvt Ltd – MKC Infrastructure Ltd (JV)

1 work across 1 asset

Expressway

Ahmedabad–Dholera Expressway (NE-7 / NH-751)

Package 4: Dholera SIR–Adhelai (38 km) · NHAI

Completed
Awarded
2020
Completed
Mar 2026
Value
Not disclosed
Age
7 months

The January 2023 NHAI status list names the Dineshchandra R Agrawal Infracon – MKC Infrastructure joint venture (appointed 13 December 2021, 28.19% progress); Wikipedia and a May 2024 NHAI under-implementation list (as uploaded to SlideShare) name only Dineshchandra R. Agrawal Infracon Pvt Ltd. For the whole expressway, Wikipedia gives a cost of Rs 3,196 crore excluding land and the 2023 status list a total capital cost of Rs 4,110 crore; no package-level cost was found.

Checked against sources