H.G. Infra Engineering Ltd
2 works across 2 assets · ₹781 crore in sourced contract value
Narol - Vishala - Sarkhej elevated corridor (NH-47)
Six-lane upgrade with elevated corridor (hybrid annuity) · NHAI / MoRTH
- Awarded
- Sep 2024
- Completed
- Not on record
- Value
- ₹781 crore
- Age
- —
Letter of award from the Ministry of Road Transport and Highways announced on 9 September 2024; bid Rs 781.11 crore against the ministry's estimate of Rs 883.24 crore; 2.5-year construction period on hybrid annuity mode. H.G. Infra's own project page gives the project cost as Rs 862.11 crore. Financial closure by its subsidiary H.G. Narol Sarkhej Highway Pvt Ltd was reported in October 2025. The scheme was put at Rs 1,295 crore when reviewed under PM GatiShakti in July 2024.
Shastri Bridge (Lal Bahadur Shastri Bridge, Vishala - Pirana)
Replacement eight-lane bridge (part of Narol-Sarkhej corridor contract) · NHAI
- Awarded
- Sep 2024
- Completed
- Not on record
- Value
- Not disclosed
- Age
- —
A March 2024 DeshGujarat report on the Prime Minister's virtual ground-breaking says the NH-47 Narol–Sarkhej elevated corridor project (then put at Rs 1,295 crore) includes an eight-lane Lal Bahadur Shastri bridge. In September 2024 HG Infra Engineering Ltd announced it had received a Rs 781 crore hybrid-annuity project from the Ministry of Road Transport and Highways to upgrade the road and build an elevated corridor from Narol Junction to Sarkhej Junction on NH-47 (10.63 km, 2.5-year period). The award report does not itemise the bridge, so its inclusion in HG Infra's scope is inferred from the earlier project description; the bridge's own cost is not separated, and no source read confirms that construction of the new bridge has started.