Shastri Bridge (Lal Bahadur Shastri Bridge, Vishala - Pirana)

NHAI · Sabarmati river between Vishala circle and Pirana junction, NH-47

A roughly forty-year-old (as of 2023) river bridge carrying NH-47 between Vishala and the Narol/Pirana side. The NH-47 Narol–Sarkhej corridor project announced in March 2024 includes an eight-lane Shastri bridge.

4
works on record
—
no completion date on record
₹5.51 cr
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 4 of 4

    Bearing and pedestal repairs under traffic restriction

    Under construction
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    9 Aug 2025
    Completion
    Not on record
    Contract value
    Not disclosed

    The police commissioner closed the old bridge to heavy and medium goods vehicles and passenger vehicles from 9 August 2025 to 8 February 2026 after a National Highways inspection found deteriorated bearings and pedestals; a notification of 7 February 2026 extended the restriction to 7 January 2027 'as repair work on the bridge continues'. No contractor is named.

    Checked against sources
  2. Work 3 of 4

    Replacement eight-lane bridge (part of Narol-Sarkhej corridor contract)

    Status not confirmed
    Contract awarded
    Sep 2024
    Work started
    Not on record
    Completion
    Not on record
    Contract value
    Not disclosed

    A March 2024 DeshGujarat report on the Prime Minister's virtual ground-breaking says the NH-47 Narol–Sarkhej elevated corridor project (then put at Rs 1,295 crore) includes an eight-lane Lal Bahadur Shastri bridge. In September 2024 HG Infra Engineering Ltd announced it had received a Rs 781 crore hybrid-annuity project from the Ministry of Road Transport and Highways to upgrade the road and build an elevated corridor from Narol Junction to Sarkhej Junction on NH-47 (10.63 km, 2.5-year period). The award report does not itemise the bridge, so its inclusion in HG Infra's scope is inferred from the earlier project description; the bridge's own cost is not separated, and no source read confirms that construction of the new bridge has started.

    Checked against sources
  3. Work 2 of 4

    Major repairs with one-side closure

    Status not confirmed
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    6 Dec 2023
    Completion
    Not on record
    Contract value
    Not disclosed

    DeshGujarat reported that one side of the bridge would be closed from 6 December 2023 for an announced four months of major repairs by NHAI, with heavy vehicles diverted via Piplaj-Pirana. No source read confirms when or whether this repair was completed.

    Checked against sources
  4. Work 1 of 4

    Rehabilitation tender (joints)

    In tender
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Not on record
    Completion
    Not on record
    Contract value
    ₹5.51 crore

    In June 2023, after photographs of the deck joints circulated, NHAI said a Rs 5.51 crore rehabilitation tender was at an advanced stage; AMC had repeatedly asked NHAI for repairs. Contractor not named.

    Checked against sources

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Shastri Bridge (Lal Bahadur Shastri Bridge, Vishala - Pirana).

Snap a photo next time you drive past and be the first to post.