FlyoverUnder construction

Tapovan circle flyover, SP Ring Road

AUDA · Tapovan circle, SP Ring Road (north)

A six-lane flyover with junction improvements on the SP Ring Road. One of ten junction structures AUDA planned with an Asian Development Bank loan (Ahmedabad Peri-urban Livability Improvement Project); six tenders were approved in September 2022 and later repackaged.

1
work on record
—
no completion date on record
—
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Original construction (ADB Package B: Nikol, Dastan, Tapovan)

    Under construction
    Contract awarded
    14 Mar 2024
    Work started
    8 Jul 2024
    Completion
    Not on record
    Contract value
    Not disclosed

    Single item-rate contract covering the Nikol, Dastan and Tapovan junctions, valued at Rs 291.49 crore in total (about USD 34.8 million on ADB's contract list, dated 31 July 2024); this bridge's own cost is not separately reported; a May 2023 estimate for Tapovan alone was Rs 70 crore. ADB documents describe the package as 'two grade separators' across the three junctions while local reports speak of three bridges. Tendered October-December 2023; 45-day diversions were notified in June 2024.

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Tapovan circle flyover, SP Ring Road.

Snap a photo next time you drive past and be the first to post.

Tapovan circle flyover, SP Ring Road · Who Built What