FlyoverUnder construction

Ramol junction flyover, SP Ring Road

AUDA · Ramol (Adani) junction, SP Ring Road (east) · 0.9 km

A six-lane, 27 m wide flyover with junction improvements on the eastern arc of the SP Ring Road. One of ten junction structures AUDA planned with an Asian Development Bank loan (Ahmedabad Peri-urban Livability Improvement Project); six tenders were approved in September 2022 and later repackaged.

1
work on record
—
no completion date on record
—
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Original construction (ADB Package A: Bakrol, Hathijan, Ramol, Panjrapol)

    Under construction
    Contract awarded
    23 Aug 2024
    Work started
    1 Oct 2024
    Completion
    Not on record
    Contract value
    Not disclosed

    Single item-rate contract for four flyovers valued at Rs 391.16 crore in total (ADB lists about USD 45.3 million, contract dated 23 January 2025). DeshGujarat's September 2024 breakdown gives the Ramol flyover as Rs 80 crore, 900 m long and 27 m wide, but its four figures do not add up to the contract total, so no separate cost is shown; a May 2023 report put Hathijan, Ramol and Panjrapol together at Rs 243 crore. The foundation stone was scheduled to be laid by PM Modi on 16 September 2024, and AUDA announced traffic diversions in late December 2024. Award (23 August 2024), start (1 October 2024) and scheduled completion (1 October 2027) are from an ADB monitoring-report table.

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Ramol junction flyover, SP Ring Road.

Snap a photo next time you drive past and be the first to post.