Original construction
- Awarded
- Not on record
- Started
- 30 Jul 2012
AMC · IIM Road, Vastrapur (between IIM old and new campus gates) · 0.551 km
A 551 m two-lane east-west flyover on IIM Road in west Ahmedabad, running between the two IIM-Ahmedabad campus gates.
Every construction, widening and repair we could source, newest first. Tap “How we know this” on any entry.
DeshGujarat (January 2014) names the builder as Dineshchandra R Agrawal Infracon Pvt Ltd and gives a start date of 30 July 2012. The 15-month contract should have finished in October 2013; the deadline slipped to 26 January 2014, with late pile and dynamic load testing cited. Inauguration by the chief minister was expected on 3 February 2014; the actual opening date is not confirmed in the sources read. Rs 38.69 crore is described as the estimated cost.