FlyoverUnder construction

Bakrol junction flyover, SP Ring Road

AUDA · Bakrol junction, SP Ring Road (south-east)

A six-lane flyover with junction improvements on the eastern side of the SP Ring Road. One of ten junction structures AUDA planned with an Asian Development Bank loan (Ahmedabad Peri-urban Livability Improvement Project); six tenders were approved in September 2022 and later repackaged.

1
work on record
—
no completion date on record
—
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Original construction (ADB Package A: Bakrol, Hathijan, Ramol, Panjrapol)

    Under construction
    Contract awarded
    23 Aug 2024
    Work started
    1 Oct 2024
    Completion
    Not on record
    Contract value
    Not disclosed

    Single item-rate contract for four flyovers valued at Rs 391.16 crore in total (ADB lists about USD 45.3 million, contract dated 23 January 2025, under Rajkamal Builders Infrastructure Pvt Ltd); the cost of this bridge alone is not separately reported; a May 2023 TV9 report and a September 2024 DeshGujarat report carried an estimate of Rs 64 crore for Bakrol. The Prime Minister was scheduled to lay the foundation stone on 16 September 2024 and traffic diversions were announced in late December 2024. Award (23 August 2024) and start (1 October 2024) dates and the 1 October 2027 scheduled completion are from an ADB monitoring-report table, which names the contractor as the Rajkamal-Kalthia joint venture.

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Bakrol junction flyover, SP Ring Road.

Snap a photo next time you drive past and be the first to post.