RoadCompleted

Ahmedabad BRTS (Janmarg) corridor

AMC (Ahmedabad Janmarg Ltd) · Citywide · 89 km

The dedicated bus corridor network running down the median of major roads, designed by CEPT University.

3
works on record
10 yr 10 mo
since last completed (Dec 2015)
₹1,329 cr
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 3 of 3

    Subway at Soni-ni-Chali junction on NH-8 (for BRTS)

    Completed
    Contract awarded
    Not on record
    Work started
    Not on record
    Completed
    Not on record
    Contract value
    Not disclosed

    Listed by the contractor as 'sub way at Sini ni chal Junction on NH-8 for BRTS Ahmedabad' for AMC, completed in financial year 2010-11, 1200 mm piles with RCC box. Cost is left blank because the firm's own documents disagree: its website gives Rs 47.5 million, while its completed-works statement shows an estimated cost of about Rs 33.9 crore, a revised contract of Rs 23.5 crore and about Rs 23.55 crore of work done, with award on 2 July 2009 and actual completion on 3 January 2011.

  2. Work 2 of 3

    BRTS corridor construction package (GRIL–MSKEL JV)

    Status not confirmed
    Contract awarded
    Not on record
    Work started
    Not on record
    Completion
    Not on record
    Contract value
    ₹129 crore

    An ICRA rating note of August 2010 says M.S. Khurana Engineering was executing 'construction of Bus Road Transport System (BRTS) corridors in Ahmedabad (Rs 129.0 crore)' with 'G R infrastructure Limited (GRIL-MSKEL JV)', one of two 40:60 joint ventures it then had. Which corridor stretch the package covered is not stated, and no source opened confirms when or whether this package was completed. The partner is commonly known as G R Infraprojects Ltd, but ICRA's note uses the name given here.

    Checked against sources
  3. Work 1 of 3

    Corridor construction (phased)

    Completed
    Contract awarded
    Not on record
    Work started
    Not on record
    Completed
    Dec 2015
    Contract value
    ₹1,200 crore
    Age since completion
    10 yr 10 mo

    Ahmedabad Janmarg Ltd's own 'Team' page (archived copy, June 2023) lists the road-infrastructure contractors as 'Roman Tarmet and IRB Ltd., GRIL-MSKEL (JV), J.KUMAR-PBA (JV)'; bus-station works by Nila Infrastructure, P. R. Patel & Co and D. R. Agrawal Infracon; planning and design by CEPT University; and project management by Lea Associates South Asia. The page spells the first firm 'Roman Tarmet' and does not say which firm built which stretch. A brokerage's company history of IRB records two 2007 AMC contracts: Narol Circle–Naroda Patiya (Rs 132.99 crore) and Pirana–Danilimda–Maninagar–Narol (Rs 78.36 crore). Per Wikipedia, the first corridor opened on 14 October 2009 and the network reached 89 km by December 2015 at a total cost of about Rs 1,200 crore (the same article's introduction says December 2017). The Rs 1,200 crore figure is the cost of the whole network, not of any one contractor's work.

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Ahmedabad BRTS (Janmarg) corridor.

Snap a photo next time you drive past and be the first to post.