Who Built What
All contractors

Contractor

Kalthia Engineering and Construction (listed as 'Kalthia Energy' in the source's table)

1 work across 1 asset

Road

Kharicut Canal redevelopment corridor (road over covered canal)

Phase 1, Package 5: Thomas English School – Vinzol Vehla · AMC (50:50 funding with Gujarat irrigation department)

Under construction
Awarded
Not on record
Completed
Not on record
Value
Not disclosed
Age
—

Gujarat Samachar's 25 June 2024 table gives the agency as 'Kalthia Energy', but the same article's text names the package 5 contractor as Kalthia Engineering and Construction, and Kalthia's own website lists 'Development of Kharicut Canal at Ahmedabad' among its projects. The table prints the amount as Rs 2,700 crore, inconsistent with the article's Rs 1,250 crore total for all five packages, so no cost is shown. The opposition alleged in that report that this package was being built with only a retaining wall; AMC denied any irregularity. Phase 1 overall has been reported at Rs 1,200 crore (March 2024), Rs 1,250 crore (June 2024) and Rs 1,338 crore (March 2025), and was described as nearly 80% complete in March 2025.

Kalthia Engineering and Construction (listed as 'Kalthia Energy' in the source's table) · Who Built What