Who Built What
All roads & bridges
Rail overbridgeUpcoming

Vatva–Vinzol railway overbridge (LC 305, proposed)

Western Railway / AMC · Vatva – Vinzol (Geratpur–Ahmedabad section) · 0.851 km

Planned four-lane road overbridge to replace level crossing 305 (Vatva–Vinzol) on the Geratpur–Ahmedabad section of Western Railway. The design has a 106 m railway span of two 53 m composite girders, a 150 m viaduct and 595 m of approaches.

1
work on record
—
no completion date on record
₹153 cr
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    New four-lane railway overbridge

    Upcoming
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Not on record
    Completion
    Not on record
    Contract value
    ₹153 crore

    Swarajya reported on 13 August 2026 that Indian Railways had cleared the bridge at a sanctioned cost of Rs 153 crore under Western Railway's umbrella programme for road over/under bridges (TV9 Gujarati carried the same on 20 September 2026). The same crossing appears in the AMC's 2026-27 'Phatak Mukt Abhiyan' list of five ROBs (Rs 775 crore in total). Length_km is the sum of the three reported components; cost-sharing with the AMC is not spelled out.

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Vatva–Vinzol railway overbridge (LC 305, proposed).

Snap a photo next time you drive past and be the first to post.