Rail overbridgeCompleted

Vatva railway overbridge (Narol–Vatva)

AMC · Narol – Vatva · 0.742 km

A 742 m railway overbridge in the Narol–Vatva area of south-east Ahmedabad that came into use at the start of 2012.

1
work on record
14 yr 9 mo
since last completed (Jan 2012)
₹35.19 cr
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Original construction

    Completed
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Not on record
    Completed
    Jan 2012
    Contract value
    ₹35.19 crore
    Age since completion
    14 yr 9 mo

    In mid-January 2012 the bridge had not been formally opened but local traffic was already using it. Contractor and agency are not named in the source; single-source figures.

    Checked against sources

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Vatva railway overbridge (Narol–Vatva).

Snap a photo next time you drive past and be the first to post.