Rail overbridgeCompleted
Vatva railway overbridge (Narol–Vatva)
AMC · Narol – Vatva · 0.742 km
A 742 m railway overbridge in the Narol–Vatva area of south-east Ahmedabad that came into use at the start of 2012.
1
work on record
14 yr 9 mo
since last completed (Jan 2012)
₹35.19 cr
total sourced contract value
—
no citizen ratings yet
Build history
Every construction, widening and repair we could source, newest first.
- CompletedWork 1 of 1
Original construction
- Contractor
- Not on public record
- Contract awarded
- Not on record
- Work started
- Not on record
- Completed
- Jan 2012
- Contract value
- ₹35.19 crore
- Age since completion
- 14 yr 9 mo
In mid-January 2012 the bridge had not been formally opened but local traffic was already using it. Contractor and agency are not named in the source; single-source figures.
Checked against sources
Citizen reports
Anonymous photos and notes from people who use this stretch.
No reports yet for Vatva railway overbridge (Narol–Vatva).
Snap a photo next time you drive past and be the first to post.