Thaltej–Sola–Gota elevated corridor (SG Highway)
R&B Gujarat (National Highway Division) · Thaltej underpass – Sola railway bridge – Sola Bhagwat – Gota · 4.18 km
A continuous 4.18 km elevated stretch on SG Highway formed by a 1.48 km Thaltej–Sola flyover and a 2.36 km Gota–Science City corridor.
Build history
Every construction, widening and repair we could source, newest first.
- CompletedWork 2 of 2
Gota flyover–Science City flyover elevated corridor (2.36 km)
- Contractor
- Not on public record
- Contract awarded
- Not on record
- Work started
- Not on record
- Completed
- Nov 2021
- Contract value
- ₹170 crore
- Age since completion
- 4 yr 11 mo
Inaugurated at the start of November 2021; passes over Sola Bhagwat, Kargil petrol pump, Janata Nagar and Zydus junctions. Built as part of SG Highway six-laning Package III (Rs 266 crore per the R&B Department; Rs 249.16 crore original value per Times of India). The package contractor could not be confirmed from any source that opened.
Checked against sources - CompletedWork 1 of 2
Thaltej–Sola flyover (1.48 km)
- Contractor
- Not on public record
- Contract awarded
- Not on record
- Work started
- Not on record
- Completed
- Jun 2021
- Contract value
- Not disclosed
- Age since completion
- 5 yr 4 mo
Opened to traffic on 27 June 2021. Built as part of SG Highway six-laning Package III (Ch. 31/300–35/480), listed by the Gujarat R&B Department at Rs 266 crore. The package contractor could not be confirmed from any source that opened.
Checked against sources
Citizen reports
Anonymous photos and notes from people who use this stretch.
No reports yet for Thaltej–Sola–Gota elevated corridor (SG Highway).
Snap a photo next time you drive past and be the first to post.