Shahibaug railway underpass
AMC / Western Railway · Shahibaug (airport road – Delhi Darwaza / Kalupur link)
Three-armed road underpass beneath the railway at Shahibaug on the main route between the airport and the old city. AMC plans to rebuild it with a wider carriageway and an extra lane towards the RTO.
Build history
Every construction, widening and repair we could source, newest first.
- In tenderWork 2 of 2
Reconstruction with additional lane and at-grade side roads
- Contractor
- Not on public record
- Contract awarded
- Not on record
- Work started
- Not on record
- Completion
- Not on record
- Contract value
- ₹24.81 crore
Tender floated in July 2026 at Rs 24.81 crore excluding GST (the 2025-26 draft budget had pencilled in Rs 30 crore). Scope: rebuild the underpass, widen the carriageway from 6 m to 7.5 m, add a lane towards the RTO and build two-lane roads along both sides of the railway. DeshGujarat gives an 18-month period, The Live Ahmedabad about two years.
Checked against sources - CompletedWork 1 of 2
Western Railway track strengthening and plate replacement over the underpass
- Contractor
- Not on public record
- Contract awarded
- Not on record
- Work started
- 29 Nov 2025
- Completed
- Mar 2026
- Contract value
- Not disclosed
- Age since completion
- 7 months
Western Railway closed the underpass at night from 29 November to 8 December 2025 and again in day and night blocks from 19 to 28 March 2026 to replace worn plates and strengthen the track structure. Separately, it was closed in January 2026 while Dineshchandra R. Agrawal Infracon launched bullet-train viaduct segments nearby.
Checked against sources
Citizen reports
Anonymous photos and notes from people who use this stretch.
No reports yet for Shahibaug railway underpass.
Snap a photo next time you drive past and be the first to post.