Sarkhej LC 28 railway overbridge-cum-elevated corridor (over SG Highway)

AMC · Sarkhej Circle – L.J. Circle – Sanand Junction, on 60 m TP road · 1.55 km

Planned four-lane structure replacing level crossing 28 on the Ahmedabad–Botad line and crossing SG Highway and the Sanand–Sarkhej road, targeted for completion before the 2030 Commonwealth Games.

1
work on record
—
no completion date on record
₹364 cr
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Construction on EPC mode

    In tender
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Not on record
    Completion
    Not on record
    Contract value
    ₹364 crore

    DeshGujarat reported on 29 August 2026 that the AMC had floated an EPC tender estimated at Rs 364.44 crore (excluding GST), with a 39-month completion period and a 10-year defect liability period. The tender notice itself was not located on the nProcure portal, so the notice number and bid closing date are not recorded.

    Checked against sources

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Sarkhej LC 28 railway overbridge-cum-elevated corridor (over SG Highway).

Snap a photo next time you drive past and be the first to post.