Original construction (Riverfront phase 1)
- Awarded
- Not on record
- Started
- Not on record
- Completed
SRFDCL / AMC · West bank of the Sabarmati, parallel to Ashram Road (Vasna – Subhash Bridge) · 11 km
The roughly 11 km riverside road on the west bank built as part of Sabarmati Riverfront phase 1, with a 25 m right of way, to relieve Ashram Road. Rickshaws and commercial vehicles are not allowed on it.
Every construction, widening and repair we could source, newest first. Tap “How we know this” on any entry.
Built under the phase 1 riverfront programme designed by HCP Design Planning and Management (consultant); first riverfront sections opened to the public on 15 August 2012 and the road was formally named after Pramukh Swami on 21 January 2017. Road-specific cost, opening date and contractors were not found in sources read.