Sabarmati Riverfront East road (River Drive East)
SRFDCL / AMC · East bank of the Sabarmati (Danilimda – Shahibaug Dafnala)
The riverside road on the east bank built under Sabarmati Riverfront phase 1, with a 30 m right of way, giving the eastern city a continuous north-south route.
Build history
Every construction, widening and repair we could source, newest first.
- Under constructionWork 2 of 2
Partial closure for Subhash Bridge demolition
- Contractor
- Not on public record
- Contract awarded
- Not on record
- Work started
- 28 May 2026
- Completion
- Not on record
- Contract value
- Not disclosed
A section of the east riverfront road and the lower promenade beneath Subhash Bridge was shut while the bridge's old superstructure was being dismantled; no reopening date was given.
Checked against sources - CompletedWork 1 of 2
Original construction (Riverfront phase 1)
- Contractor
- Not on public record
- Contract awarded
- Not on record
- Work started
- Not on record
- Completed
- Not on record
- Contract value
- Not disclosed
Part of the 11.5 km phase 1 riverfront on each bank designed by HCP Design Planning and Management (consultant). Road-specific cost, opening date and contractors were not found in sources read.
Checked against sources
Citizen reports
Anonymous photos and notes from people who use this stretch.
No reports yet for Sabarmati Riverfront East road (River Drive East).
Snap a photo next time you drive past and be the first to post.