Sabarmati barrage-cum-bridge (Acher – Camp Sadar Bazar)
SRFDCL · Acher (west bank) – Camp Sadar Bazar (east bank), Riverfront Phase 2 · 1.048 km
A six-lane bridge with an air-filled rubber barrage beneath it, being built as part of Sabarmati Riverfront Phase 2.
Build history
Every construction, widening and repair we could source, newest first.
- Under constructionWork 2 of 2
Air-filled rubber barrage supply, installation and maintenance
- Contractor
- YOOIL Envirotech Pvt Ltd (South Korea)
- Contract awarded
- Not on record
- Work started
- Not on record
- Completion
- Not on record
- Contract value
- ₹53.78 crore
Contract covers manufacture, supply, installation and maintenance of the air-filled rubber barrage and its automation system. Rubber membrane installation was to begin after civil work, post-monsoon 2026.
Checked against sources - Under constructionWork 1 of 2
Civil construction of bridge
- Contractor
- Rajkamal Builders Infrastructure Pvt Ltd
- Contract awarded
- Not on record
- Work started
- Not on record
- Completion
- Not on record
- Contract value
- ₹240 crore
Civil contract (tender value Rs 239.92 crore) awarded by SRFDCL. The central span is described as a 126 m iron arch. As of March 2025 the diaphragm wall and riverbed filling were under way, with completion expected by April 2027.
Checked against sources
Citizen reports
Anonymous photos and notes from people who use this stretch.
No reports yet for Sabarmati barrage-cum-bridge (Acher – Camp Sadar Bazar).
Snap a photo next time you drive past and be the first to post.