Who Built What
All roads & bridges
Rail overbridgeCompleted

Ranip railway bridge

AMC · Ranip

A rail overbridge at Ranip whose construction was held up by land acquisition.

1
work on record
about 3 years
since last completed (2023)
—
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Original construction

    Completed
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Not on record
    Completed
    2023
    Contract value
    Not disclosed
    Age since completion
    about 3 years

    Flyover at the GST railway crossing linking Ranip and New Ranip. Cleared by the AMC in 2012–13 at an early estimate of about Rs 18.3 crore; the Times of India says the railways approved the land swap on 2 February 2017, and a June 2019 report put the project cost at Rs 78 crore and said one landing had been aligned onto private land. Vibes of India and Gujarat Samachar say it was completed only in 2023, after about two years were lost obtaining roughly 5,000 sq m of railway land for which the AMC paid about Rs 50 crore (the Times of India's 2018–19 reports describe 5,000 sq yards exchanged for about 11,000 sq yards of AMC land). Sources are not fully consistent on timing: a June 2018 Times of India item says the GST crossing project was 'inaugurated' on 15 June 2018, and a July 2025 Times of India piece says the 24-month project begun in 2013 'stretched to five years'. Contractor not named.