Bearing replacement (three-bridge repair plan)
- Awarded
- 22 Oct 2025
- Started
- Not on record
- Completion
AMC · Ahmedabad (location not stated in sources read)
An AMC bridge named after Parikshitlal Majmudar that the corporation lists among its structures more than 25 years old. It was grouped with the Gandhi and Sardar bridges for bearing repairs after the 2025 Gambhira collapse. Coordinates are a placeholder for central Ahmedabad because no source read gives its location.
Every construction, widening and repair we could source, newest first. Tap “How we know this” on any entry.
On 22 October 2025 the AMC approved Rs 21.55 crore to lift 89 spans across the Gandhi (38), Sardar (48) and Parikshitlal Majmudar (3) bridges, replace elastomeric bearings and add steel plates and seismic arresters, by widening the scope of the contractor already restoring Ellis Bridge. The reports do not name that firm (the registry's Ellis Bridge entry records the restoration contractor as Rajkamal Builders Infrastructure Pvt Ltd). Per-bridge cost not given; at approval the work on this bridge was still to come and its completion was not confirmed.