UnderpassCompleted

Paldi Jalaram Mandir railway underpass

AMC / Western Railway · Paldi crossroads – Gujarat College / Law Garden · 0.45 km

A 450 m four-lane underpass beneath the Botad rail line and the metro viaduct at Paldi.

1
work on record
2 yr 7 mo
since last completed (4 Mar 2024)
₹83 cr
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Original construction

    Completed
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Not on record
    Completed
    4 Mar 2024
    Contract value
    ₹83 crore
    Age since completion
    2 yr 7 mo

    Inaugurated on 4 March 2024; Gujarat Samachar reports it was closed within hours because two mobile towers on the route had not been removed. The 452 m underpass was planned by the Gujarat Metro Rail Corporation (GMRC) in 2016 and jointly funded: GMRC about Rs 47 crore, the AMC Rs 33 crore and the Railways Rs 3 crore. A GMRC official attributed the cost to a 50 m extension, utility shifting and micro-tunnelling among other factors; the opposition says the estimate rose from Rs 45 crore to Rs 83 crore (one report says about Rs 85 crore), and The Times of India described it as about four years late. Gujarat Samachar reported exposed reinforcement 172 days after opening and, citing unnamed official sources, said the construction was carried out by Ahmedabad-based Ravi Builders; this is a single report and is not confirmed elsewhere in the sources read.

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Paldi Jalaram Mandir railway underpass.

Snap a photo next time you drive past and be the first to post.