Omnagar–Chamanpura railway underpass (LC 3)

Western Railway / AMC · Omnagar – Chamanpura (Asarwa–Himmatnagar line) · 0.265 km

A limited-height subway, 265 m long and 8.5 m wide, replacing level crossing no. 3 between Omnagar and Chamanpura on the Asarwa–Himmatnagar railway section. The box was pushed under the live tracks.

1
work on record
—
no completion date on record
₹19 cr
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Limited-height subway by box pushing

    Under construction
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Not on record
    Completion
    Not on record
    Contract value
    ₹19 crore

    Cost about Rs 19 crore. The Railway Minister asked for completion before Navratri 2026 and the divisional railway manager set 30 September 2026 as the target; utility shifting by AMC and Torrent Power was the remaining dependency. Contractor and start date not given; single-source.

    Checked against sources

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Omnagar–Chamanpura railway underpass (LC 3).

Snap a photo next time you drive past and be the first to post.