Nathalal Jhagda railway overbridge

AMC · East Ahmedabad (exact location not stated in sources read)

One of the AMC's older railway overbridges, named after Nathalal Jhagda and listed by the corporation among its bridges more than 25 years old. Post-Gambhira inspections flagged its bearings for replacement. Coordinates are a rough placeholder.

3
works on record
—
no completion date on record
—
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 3 of 3

    Bearing replacement and strengthening (six-ROB package)

    Upcoming
    Contractor
    Not on public record
    Contract awarded
    Feb 2026
    Work started
    Not on record
    Completion
    Not on record
    Contract value
    Not disclosed

    One of six railway overbridges in an AMC package of about Rs 63 crore (reported as Rs 62.79 crore to Rs 63.23 crore) approved in February 2026 after the post-Gambhira inspection of 78 bridges: spans are to be jacked up, worn bearings replaced with elastomeric ones under a 15-year guarantee, and seismic arresters fitted. Package cost only; no contractor named and start not confirmed in sources read.

  2. Work 2 of 3

    Minor repairs (with Jivraj Mehta and Chandrabhaga bridges)

    Under construction
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Dec 2025
    Completion
    Not on record
    Contract value
    Not disclosed

    Gujarat Samachar reported on 31 December 2025 that repairs on three bridges including this one were being carried out at a combined cost of about Rs 3 crore and were expected to finish within 15 days. The per-bridge share, start date and contractor were not given. That report is the last status found; completion has not been confirmed. Single source.

    Checked against sources
  3. Work 1 of 3

    Original construction

    Completed
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Not on record
    Completed
    Not on record
    Contract value
    Not disclosed

    No build record found. A February 2026 report puts its age at about 27 years (so built around 1999), and the AMC's July 2025 age list places it in the over-25-years group. Builder and cost unknown.

    Checked against sources

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Nathalal Jhagda railway overbridge.

Snap a photo next time you drive past and be the first to post.