Who Built What
All roads & bridges
Rail overbridgeCompleted

Naroda GIDC railway overbridge (Satguru Teuramji Maharaj flyover, LC 9)

AMC · Naroda, near GIDC estate (Ahmedabad–Himmatnagar line) · 0.772 km

A 771.64 m road overbridge that replaced level crossing no. 9 on the Ahmedabad–Himmatnagar railway line beside the Naroda GIDC estate. It has two to three lanes and parking space underneath.

1
work on record
4 yr 4 mo
since last completed (8 Jun 2022)
—
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Original construction

    Completed
    Contractor
    Not on public record
    Contract awarded
    Not on record
    Work started
    Not on record
    Completed
    8 Jun 2022
    Contract value
    Not disclosed
    Age since completion
    4 yr 4 mo

    Dedicated by the Chief Minister on 8 June 2022 as part of a Rs 103 crore set of AMC inaugurations; the bridge's own cost and contractor are not given. A Naroda railway-crossing flyover had been in AMC budgets since at least 2012 and 2016.

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Naroda GIDC railway overbridge (Satguru Teuramji Maharaj flyover, LC 9).

Snap a photo next time you drive past and be the first to post.