Work 1 of 1
Demolition and reconstruction
Contractor
Not on public record
- Awarded
- Not on record
- Started
- 1 Jan 2026
GIDC · Vatva GIDC (Ramol crossroads – Trikampura Patiya) · 0.023 km
A 23 m road bridge across the Kharicut canal in the Vatva industrial estate. It was declared unsafe and is being pulled down and replaced by the Gujarat Industrial Development Corporation.
Every construction, widening and repair we could source, newest first. Tap “How we know this” on any entry.
The police notification closed a 200 m stretch for six months so GIDC could dismantle the old bridge and build a new one; the executing contractor and cost are not named. Single-source.
Anonymous photos and notes from people who use this stretch.