Atal Pedestrian Bridge

SRFDCL / AMC · Sabarmati Riverfront between Ellis Bridge and Sardar Bridge · 0.3 km

A 300 m kite-inspired steel footbridge across the Sabarmati connecting the two riverfront promenades.

1
work on record
4 yr 1 mo
since last completed (27 Aug 2022)
₹74 cr
total sourced contract value
—
no citizen ratings yet

Build history

Every construction, widening and repair we could source, newest first.

  1. Work 1 of 1

    Original construction

    Completed
    Contract awarded
    Not on record
    Work started
    2018
    Completed
    27 Aug 2022
    Contract value
    ₹74 crore
    Age since completion
    4 yr 1 mo

    Designed by STUP Consultants; structurally complete in June 2022 and inaugurated 27 August 2022.

    Checked against sources

Citizen reports

Anonymous photos and notes from people who use this stretch.

Rate condition

No reports yet for Atal Pedestrian Bridge.

Snap a photo next time you drive past and be the first to post.