Atal Pedestrian Bridge
SRFDCL / AMC · Sabarmati Riverfront between Ellis Bridge and Sardar Bridge · 0.3 km
A 300 m kite-inspired steel footbridge across the Sabarmati connecting the two riverfront promenades.
1
work on record
4 yr 1 mo
since last completed (27 Aug 2022)
₹74 cr
total sourced contract value
—
no citizen ratings yet
Build history
Every construction, widening and repair we could source, newest first.
- CompletedWork 1 of 1
Original construction
- Contractor
- P&R Infraprojects Ltd
- Contract awarded
- Not on record
- Work started
- 2018
- Completed
- 27 Aug 2022
- Contract value
- ₹74 crore
- Age since completion
- 4 yr 1 mo
Designed by STUP Consultants; structurally complete in June 2022 and inaugurated 27 August 2022.
Checked against sources
Citizen reports
Anonymous photos and notes from people who use this stretch.
No reports yet for Atal Pedestrian Bridge.
Snap a photo next time you drive past and be the first to post.