Contractor
Roman Tarmat Ltd; IRB Infrastructure Developers Ltd; GRIL–MSKEL (JV); J. Kumar–PBA (JV)
1 work across 1 asset · ₹1,200 crore in sourced contract value
- Awarded
- Not on record
- Completed
- Dec 2015
- Value
- ₹1,200 crore
- Age
- 10 yr 10 mo
Ahmedabad Janmarg Ltd's own 'Team' page (archived copy, June 2023) lists the road-infrastructure contractors as 'Roman Tarmet and IRB Ltd., GRIL-MSKEL (JV), J.KUMAR-PBA (JV)'; bus-station works by Nila Infrastructure, P. R. Patel & Co and D. R. Agrawal Infracon; planning and design by CEPT University; and project management by Lea Associates South Asia. The page spells the first firm 'Roman Tarmet' and does not say which firm built which stretch. A brokerage's company history of IRB records two 2007 AMC contracts: Narol Circle–Naroda Patiya (Rs 132.99 crore) and Pirana–Danilimda–Maninagar–Narol (Rs 78.36 crore). Per Wikipedia, the first corridor opened on 14 October 2009 and the network reached 89 km by December 2015 at a total cost of about Rs 1,200 crore (the same article's introduction says December 2017). The Rs 1,200 crore figure is the cost of the whole network, not of any one contractor's work.