Who Built What
All contractors

Contractor

RKC Infrastructure Ltd (named as the contractor of packages 1 and 4; listed as 'RKC Infrabuilt' for package 1)

1 work across 1 asset

Road

Kharicut Canal redevelopment corridor (road over covered canal)

Phase 1, Package 4: Odhav fire station – Thomas English School · AMC (50:50 funding with Gujarat irrigation department)

Under construction
Awarded
Not on record
Completed
Not on record
Value
Not disclosed
Age
—

Gujarat Samachar's 25 June 2024 list (single source) names the agency for this package as 'RKC Infrastructure', and the article text says 'RKC Infrastructure Ltd' is the contractor of both packages 1 and 4 (package 1 is listed as 'RKC Infrabuilt'). The table prints the amount as Rs 2,450 crore, which is inconsistent with the article's Rs 1,250 crore total for all five packages, so no cost is shown. The opposition leader alleged in that report that the contractor covered parts of package 4 with diaphragm walls and RCC slabs instead of the specified precast boxes; AMC's standing committee chairman and an additional city engineer denied any irregularity.

Checked against sources